The building, which opened in April, has been mainly designed with sustainability and accessibility in mind.
All services for the city of Helmond come together here.

VB&VH was awarded the contract for the production and installation of the total wayfinding. Studio Staak was responsible for the design of the functional wayfinding and the route plan.
Apart from the curved red sprayed panels, the contemporary reference boards and room numbering, special wooden totems were also made and installed.